8 Steps To Install Your Laminate Flooring
From my point of view, everything could be done by ourselves. So please take this article for consideration if you have enough resouces for China building construction materials,everything will become reasonable and can not be overpassed. You can do everything at your lowest cost budget. Steps of blow are really solve your laminate floor problems.
Step 1: Stack the Laminate Flooring Before Installation
Temperature and humidity can affect flooring planks. Acclimate the flooring in the house for 48 hours before installation. Stack the laminate flooring being used flat on the floor. Remove any plastic wrapping from the boxes and leave air space around each box to allow air to freely circulate around them. Have about 10 percent more flooring than the square feet of area of the room since you'll waste just a little when cutting some pieces.Step 2: Clean the Subfloor, Remove Base Molding
Clean the subfloor to make sure it's free of any dirt and debris. If installing on top of a new concrete floor wait until the floor is fully cured. Using a pry bar and hammer, carefully remove all base molding (if necessary) and place it out of the way.Step 3: Install the Vapor Barrier
Start by laying out the vapor barrier one row at a time from the longest wall of the room. When joining two sheets of barrier together, follow the manufacturer's directions. Some manufacturers will have you overlap the vapor barrier and some will have you butt each row against the previous one.Step 4: Trim the Door Jambs
Lay a piece of flooring flat on the subfloor and up against the door jambs. Use it as a guide to mark the jambs so that the new flooring can slide underneath the jamb. Use a “flat” saw or a coping saw to cut the jambs, making sure to cut parallel to the subfloor. This will give the floor and jamb a nice finished look without having to remove the entire jambStep 5: Install the First Row
For the best appearance, lay planks parallel to the longest wall. Install the first plank with the groove toward the wall. Place 1/2" spacers against the wall and push the first plank up against them. These spaces create an expansion gap so that the floor can "breathe" (expand and contract) and not warp or buckle. This gap will be covered later with base molding. The spacers also allow the floor to have a firm base to install against. Place the spacers about every 12 inches along the wall and at the end of each plank against adjoining walls.Step 6: Install the Flooring
For each plank, match tongue to groove and tap it into place using a scrap piece of flooring to protect the planks. Make sure the pieces fit snugly together and that there are no gaps along the length of the planks. While installing subsequent rows, stagger the joints of the flooring. When starting a new row, offset it six to eight inches so the joints at the ends of planks are not lined up row to row (which can weaken the floor and create a too-uniform look).Step 7: Install the Last Plank
The last plank will need to be trimmed to fit. To mark the plank to the correct width place a plank directly over the next to last plank and place another on top of that and slide the top plank until it sits evenly against spacers against the wall. Draw a line along the plank below the top plank along the edge of the top plank. This will mark the width of the gap between the next to the last plank and the wall. Rip cut the plank along this line and install.Step 8: Install Thresholds and Base Molding
Install any thresholds between the end of the flooring and any open doors where the flooring ends. Thresholds come in different styles to accommodate the kind and height of the flooring the new laminate floor butts up against. Remove the spacers and install base molding to cover the expansion gapThen it is time for you to forget those workers of interiol decoration. Just started to gather enough China building construction materials and send your enquiry to China building materials manufacturers on www.ecvv.com and also put above 8 spets into your mind. Fantastic things will happen accordingly.
Resource:
www.ecvv.com is an innovative and comprehensive business portal in China, dedicated to saving costs for Chinese SMEs to find buyers and export to overseas markets.
<a href="http://www.ecvv.com">www.ecvv.com</a> is an innovative and comprehensive business portal in China, dedicated to saving costs for Chinese SMEs to find buyers and export to overseas markets.
标签: China building materials manufacturers, China building materials producers, China building materials products
0 条评论:
发表评论
订阅 博文评论 [Atom]
<< 主页